State DOT to ‘reassess’ controversial Route 82 roundabouts

The state Department of Transportation will pull back a widely criticized plan to reconstruct a 1.3-mile stretch of Route 82-West Main Street with six roundabouts, a median divider and single traffic lanes in each direction. The $45 million, two-phase project received broad criticism locally, with “No 6 Roundabouts” signs joining election campaign signs in front of city homes and businesses. The $20 million first phase from Asylum to Dunham streets, with three planned roundabouts and the acquisition of five commercial properties, was slated to start construction in 2025. The project became political in September, when the DOT project team required a city resolution agreeing to accept maintenance control of the future sidewalks, roundabout centers and striping of the proposed 5-foot-wide proposed bicycle lanes.

https://www.theday.com/local-news/20221021/state-dot-to-reassess-controversial-route-82-roundabouts/

Share This Article: