Cedar Street in Meriden closed until December for bridge replacement

Workers have begun cutting off the gas mains under the bridge and are expected to finish this week. The next step is to work on the new footprint which will extend the bridge from 35 feet to 55 or 60 feet. The existing bridge will be demolished and the new abutments will be built at the same time. The road pavement will be raised six inches. The bridge carries traffic over Harbor Brook between Park and Pratt streets. Last year, the city received notice from the South Central Regional Council of Governments that it had been awarded a $3.8 million Local Transportation Capital Improvement Program grant from the state for the project. Milone & McBroom are engineering the expansion of the Meriden Green. BL Cos. is doing the channel redesign between Cedar and Center streets.

https://www.myrecordjournal.com/News/Meriden/Meriden-News/Work-underway-on-the-cedar-street-bridge-The-road-is-partially-closed.html

Share This Article: