Nighttime Bridge Maintenance on Route 8 South in Bridgeport

The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on multiple bridges along Route 8 southbound in Bridgeport, Monday, October 7, through Friday, November 22, 2019. Motorists can expect lane closures. The regular work schedule for this project is from 8:00 pm to 5:00 am. (Monday through Thursday evenings). Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.

https://portal.ct.gov/DOT/Construction-News-from-the-Connecticut-Department-of-Transportation/2019/Nighttime-Bridge-Maintenance-on-Route-8-South-in-Bridgeport

Share This Article: