![DOT timetable takes Plainville trail project through 2024](http://ffcct.org/wp-content/uploads/freshizer/57b41f6a00d4979ea89edf22d16c8114_facebook_logo_2-1156-577-c.png)
The state Department of Transportation, now in the surveying and design phase of extending the Farmington Canal Heritage Trail through Plainville, has provided a timetable for three phases of construction. This will finish connecting it to the rest of the 81.2-mile trail, which goes through Connecticut and Massachusetts.
http://www.bristolpress.com/BP-Plainville+News/357009/dot-timetable-takes-plainville-trail-project-through-2024