South Norfolk residents make their pitch for temporary bridge spanning Hall Meadow Brook

Jul 29, 2024 | Uncategorized

A contingent of concerned South Norfolk citizens met with First Selectman Matt Riiska on July 19 to urge construction of a temporary bridge across Hall Meadow Brook. The neighborhood has been cut off from Route 272 since a flash flood in July 2023 swept away bridges on Smith Hill and Old Goshen roads. Since then, the state Department of Transportation has promised to replace the bridges at a cost of $5.8 million, but the time frame for the work could extend into 2028, Riiska said. Riiska said he has held discussions with Guerrera Construction about how a temporary connection could be established. Meanwhile, Riiska said he is seeking quotes for a temporary bridge and will meet with the residents again Friday.

https://www.rep-am.com/localnews/2024/07/27/south-norfolk-residents-make-their-pitch-for-temporary-bridge-spanning-hall-meadow-brook/#google_vignette

SPREAD THE WORD BY SHARING!

Connect with us