Developer pitches Stamford high-rise to replace industrial South End lot: ‘The area is changing’

A real estate developer wants to turn the dregs of the South End’s industrial past into the area’s latest high-rise at 441 Canal St. Heyman Properties proposed 401 apartments in all, with 429 corresponding parking spaces. On the ground floor, 441 Canal will feature over 7,000 square feet of ground-floor retail space. Hennessey said the hope is to attract a small eatery, something convenient for residents “while at the same being attractive to the public.” If approved, Hennessey said he expects construction to take around 30 months, pushing the completion date at a minimum into late 2024. The Zoning Board will discuss the proposal for 441 Canal St. and the corresponding zoning map proposed by the developer again at its May 9 meeting.

https://www.stamfordadvocate.com/news/article/Developer-pitches-Stamford-high-rise-to-replace-17128343.php

Share This Article: