Metro-North’s Waterbury Branch train line to resume service 10 weeks after historic flooding

Train service will resume later this month on the Waterbury Branch Line following weeks of repairs to sections of track that were washed away during Connecticut’s historic August floods, officials announced Friday. Rail service on the route was suspended on Aug. 18 and replaced with buses while workers raced to replace nearly 7,000 tons of washed out trackbed near the Kinneytown Dam in Seymour. The repairs ended up taking about 10 weeks to complete, and necessitated the construction of temporary access roads to move equipment to the washed out areas. Crews will be out over the next week operating test trains in both directions between Waterbury and Bridgeport to inspect the tracks and railroad crossing along the entire line. The DOT cautioned the public to follow posted signs and avoid walking along the railroad tracks.

https://www.stamfordadvocate.com/connecticut/article/waterbury-branch-line-service-returns-ct-floods-19846397.php

Share This Article: