Residents voted 660 to 240 in favor of the 500,000-gallon Chestnut Ridge tank in Tuesday’s referendum, according to unofficial results. The tank would be installed in the woods between Long Meadow Lane and Briar Cliff Manor, despite slight opposition from some residents. Construction could start in the spring, with the tank going online in nine to 12 months, the public utilities director has said.
https://www.stamfordadvocate.com/local/article/Bethel-s-2-24-million-water-tank-approved-15121410.php