A section of Route 106 will be closed on weekdays as Aquarion Water Co. installs a critical new utility pipe. The closure between Old Boston Road and Old Kings Highway in Wilton began Monday and is expected to last for three to four weeks, according to the town’s Department of Public Works. Road work will occur from 7 a.m. to 5:30 p.m. Mondays through Fridays, the department said. One lane of alternating traffic is permitted through the intersection during the closure, according to Public Works. “Given the pipe age, material and limited availability of 18-inch diameter pipe and fittings, failure of these pipes during or after construction of Aquarion’s project presents an unacceptable risk,” Aquarion said in an October statement.
https://www.stamfordadvocate.com/news/article/aquarion-route-106-wilton-closure-water-main-19945704.php