Six School Upgrades Planned for New Haven, Conn.; Amazon Facility to Be Built in Waterbury

As part of ongoing repair and improvement efforts, New Haven Public School (NHPS) officials in Connecticut are proposing six renovation projects, including roof and swimming pool replacements across the district. The proposed projects include swimming pool replacements at Conte-West Hills School and Wilbur Cross High School; roof replacements at Truman School, Wilbur Cross High and James Hillhouse High School; and the construction of a new central office at 424 Chapel St. in New Haven. The plan is to eventually move the central office from 54 Meadow St. to the second floor of the Chapel Street building, the New Haven Register reported April 22, 2025. The total cost of the six projects is estimated at $25.1 million, the Register noted. In addition, on Feb. 13, 2025, there was a leak reported inside an English classroom at Wilbur Cross, which is an issue that has been difficult to address because the building’s roof has solar panels. The complaint cited concerns about mold, leaks, air quality and HVAC issues at the two schools.

https://www.constructionequipmentguide.com/six-school-upgrades-planned-for-new-haven-conn-amazon-facility-to-be-built-in-waterbury/67863

Share This Article: