Some lanes of Route 15 in the city will be closed on Saturday. The Connecticut Department of Transportation will close lanes on Route 15 between the West Rocks Road overpass and Exit 38 between 7 a.m. and 2 p.m. for state forces to conduct survey operations, according to a statement from the department. The closures are tied to a DOT project for interchange improvements on Route 15 and Route 7, the statement said. Nilesh Patel, principal engineer with the DOT, said this summer that he aims for the design of the $175 million project to be complete by the end of 2024 and for construction to begin in 2025.
https://www.stamfordadvocate.com/news/article/norwalk-route-15-lane-closures-merritt-19971674.php